A lot work done this week. The second bathroom is almost up. The tile 'hazelnut travertine' are on wall and on floor. The decoration belt is mosaic 1x1. I like how it looks like on the wall. But it does take more time to make the look. The mosaic belt along with two rows of tiles were up first, so, the work started from the middle. Our contractor said this way, it was easier to make tiles to align perfectly both from top and from bottom.
He used the wood to support the tiles for overnight dry.
Trim.
The tile wall.
Vessel sink, red!
And the big pantry.